Port, Marina & Civil InfrastructureGreece

Dam, Reservoir & Intake 3D SurveysPiraeus

Intake towers, spillway faces, and turbine trash racks sit in flow conditions that make diver inspection genuinely hazardous — intake suction and spillway discharge are exactly the environments remote survey exists for. We generate full 3D digital models of the submerged structure using ROV-based photogrammetry and sonar, giving the operator an inspection record without putting a person into the water near an active intake or spillway.

Why it matters in Piraeus

Greece's largest port and one of the busiest passenger ports in the world, handling container, ferry, and cruise traffic through the same harbor complex.

That volume of commercial and passenger vessel traffic through one harbor creates constant, real demand for in-water hull inspection and quay/berth infrastructure monitoring.

Deliverable

A 3D model of the submerged intake, spillway, or trash rack structure, captured without diver exposure to hazardous flow.

Full step-by-step methodology on the Dam, Reservoir & Intake 3D Surveys overview — the same process, run out of the Piraeus area.

Working in the Piraeus area

If there's a dam, reservoir & intake 3d surveys requirement in the Piraeus area — a single job or an ongoing programme — get in touch to discuss scope and timing.